Port of Greenville

Contact: Tommy Hart
Director, Greenville Port Commission
2701 Harbor Front Road
Greenville, MS 38701-9626
Phone: (662) 335-2683
Fax: (662) 335-0804
Email: thart@tecinfo.com
PDF: Download file

Facilities

Greenville Port Terminal transfers bulk, break-bulk, and project cargo to suit YOUR needs. Wharf-type double pier with concrete dock. Shallow draft, slack water natural harbor, 11 miles long. 250-ft. minimum channel width, with a harbor front minimum channel width of 500 ft. and a fleeting area capable of holding several hundred barges.

Amenities

  • Designated U.S. Port of Entry.
  • Certified truck scales.
  • Rail scales (not certified for trade).  
  • One Sennebogen 835 crane for barge loading and unloading.
  • A LST 218 Linkbelt crawler crane, with a 4½-yard bucket.
  • Harbor and fleeting service available.  
  • Marine dry-dock and repair services.  
  • Bulk truck/rail loading conveyers.  
  • 5,000-lb. to 52,000-lb. forklifts.  
  • Scrap handling magnets.  
  • 22,000-sq.-ft. climate-controlled warehouse.
  • Open yard hard stand storage.  
  • Grain, liquid bulk, L.P. gas, sand and gravel terminals.
  • 60-ton All Weather Bridge Crane that covers four barges at once.
  • 25-cy clamshell bucket for loading bulk cargo to truck or rail under covered structure.